1
National periodic change project
09/16/2021
Issue 11009: announced on 9/16. Please go online and browse change areas before 9/29, and report the inquiry result by 10/20
More
Schedule of feedback audit
(1) Date of first expediting to be online: 9/29/2021
(2) Date of second expediting to be online: 10/6/2021
(3) Date of first expediting inspection : 10/20/2021
(4) Date of second expediting inspection (including audit): 10/27/2021
2
National periodic change project
08/18/2021
Issue 11008: announced on 8/18. Please go online and browse change areas before 8/27, and report the inquiry result by 9/15
More
Schedule of feedback audit
(1) Date of first expediting to be online: 8/27/2021
(2) Date of second expediting to be online: 9/3/2021
(3) Date of first expediting inspection : 9/15/2021
(4) Date of second expediting inspection (including audit): 9/24/2021
3
National periodic change project
07/16/2021
Issue 11007: announced on 7/16. Please go online and browse change areas before 7/27, and report the inquiry result by 8/16
More
Schedule of feedback audit
(1) Date of first expediting to be online: 7/27/2021
(2) Date of second expediting to be online: 8/3/2021
(3) Date of first expediting inspection : 8/16/2021
(4) Date of second expediting inspection (including audit): 8/23/2021
4
National periodic change project
06/18/2021
Issue 11006: announced on 6/18. Please go online and browse change areas before 6/29, and report the inquiry result by 7/19
More
Schedule of feedback audit
(1) Date of first expediting to be online: 6/29/2021
(2) Date of second expediting to be online: 7/6/2021
(3) Date of first expediting inspection : 7/19/2021
(4) Date of second expediting inspection (including audit): 7/26/2021
5
National periodic change project
05/19/2021
Issue 11005: announced on 5/19. Please go online and browse change areas before 5/28, and report the inquiry result by 6/18
More
Schedule of feedback audit
(1) Date of first expediting to be online: 5/28/2021
(2) Date of second expediting to be online: 6/04/2021
(3) Date of first expediting inspection : 6/18/2021
(4) Date of second expediting inspection (including audit): 6/25/2021
6
National periodic change project
04/20/2021
Issue 11004: announced on 4/20. Please go online and browse change areas before 4/29, and report the inquiry result by 5/19
More
Schedule of feedback audit
(1) Date of first expediting to be online: 4/29/2021
(2) Date of second expediting to be online: 5/06/2021
(3) Date of first expediting inspection : 5/19/2021
(4) Date of second expediting inspection (including audit): 5/26/2021
7
National periodic change project
03/19/2021
Issue 11003: announced on 3/19. Please go online and browse change areas before 3/30, and report the inquiry result by 4/21
More
Schedule of feedback audit
(1) Date of first expediting to be online: 3/30/2021
(2) Date of second expediting to be online: 4/08/2021
(3) Date of first expediting inspection : 4/21/2021
(4) Date of second expediting inspection (including audit): 4/28/2021
8
National periodic change project
02/20/2021
Issue 11001: announced on 2/20. Please go online and browse change areas before 3/3, and report the inquiry result by 3/23
More
Schedule of feedback audit
(1) Date of first expediting to be online: 3/3/2021
(2) Date of second expediting to be online: 3/10/2021
(3) Date of first expediting inspection : 3/23/2021
(4) Date of second expediting inspection (including audit): 3/30/2021
9
National periodic change project
01/27/2021
Issue 11001: announced on 1/27. Please go online and browse change areas before 2/5, and report the inquiry result by 3/4
More
Schedule of feedback audit
(1) Date of first expediting to be online: 2/5/2021
(2) Date of second expediting to be online: 2/19/2021
(3) Date of first expediting inspection : 3/4/2021
(4) Date of second expediting inspection (including audit): 3/11/2021
10
National periodic change project
12/04/2020
Issue 10912: announced on 12/4. Please go online and browse change areas before 12/15, and report the inquiry result by 2021/1/5
More
Schedule of feedback audit
(1) Date of first expediting to be online: 12/15/2020
(2) Date of second expediting to be online: 12/22/2020
(3) Date of first expediting inspection : 1/5/2021
(4) Date of second expediting inspection (including audit): 1/12/2021
11
National periodic change project
11/16/2020
Issue 10910: announced on 10/16. Please go online and browse change areas before 10/27, and report the inquiry result by 11/16
More
Schedule of feedback audit
(1) Date of first expediting to be online: 10/27/2020
(2) Date of second expediting to be online: 11/3/2020
(3) Date of first expediting inspection : 11/16/2020
(4) Date of second expediting inspection (including audit): 11/23/2020
12
National periodic change project
11/16/2020
Issue 10911: announced on 11/16. Please go online and browse change areas before 11/25, and report the inquiry result by 12/15
More
Schedule of feedback audit
(1) Date of first expediting to be online: 11/25/2020
(2) Date of second expediting to be online: 12/2/2020
(3) Date of first expediting inspection : 12/15/2020
(4) Date of second expediting inspection (including audit): 12/22/2020
13
National periodic change project
09/18/2020
Issue 10909: announced on 9/18. Please go online and browse change areas before 9/28, and report the inquiry result by 10/21
More
Schedule of feedback audit
(1) Date of first expediting to be online: 9/28/2020
(2) Date of second expediting to be online: 10/7/2020
(3) Date of first expediting inspection : 10/21/2020
(4) Date of second expediting inspection (including audit): 10/28/2020
14
National periodic change project
08/18/2020
Issue 10908: announced on 8/18. Please go online and browse change areas before 8/27, and report the inquiry result by 9/16
More
Schedule of feedback audit
(1) Date of first expediting to be online: 8/27/2020
(2) Date of second expediting to be online: 9/3/2020
(3) Date of first expediting inspection : 9/16/2020
(4) Date of second expediting inspection (including audit): 9/28/2020
15
National periodic change project
07/17/2020
Issue 10907: announced on 7/17. Please go online and browse change areas before 7/28, and report the inquiry result by 8/17
More
Schedule of feedback audit
(1) Date of first expediting to be online: 7/28/2020
(2) Date of second expediting to be online: 8/4/2020
(3) Date of first expediting inspection : 7/17/2020
(4) Date of second expediting inspection (including audit): 8/24/2020
16
National periodic change project
06/19/2020
Issue 10906: announced on 6/19. Please go online and browse change areas before 7/01, and report the inquiry result by 7/21
More
Schedule of feedback audit
(1) Date of first expediting to be online: 7/1/2020
(2) Date of second expediting to be online: 7/8/2020
(3) Date of first expediting inspection : 7/21/2020
(4) Date of second expediting inspection (including audit): 7/28/2020
17
National periodic change project
05/27/2020
Issue 10905: announced on 5/19. Please go online and browse change areas before 5/28, and report the inquiry result by 6/17
More
Schedule of feedback audit
(1) Date of first expediting to be online: 5/28/2020
(2) Date of second expediting to be online: 6/4/2020
(3) Date of first expediting inspection : 6/17/2020
(4) Date of second expediting inspection (including audit): 6/23/2020
18
National periodic change project
04/20/2020
Issue 10904: announced on 4/20. Please go online and browse change areas before 4/29, and report the inquiry result by 5/19
More
Schedule of feedback audit
(1) Date of first expediting to be online: 4/29/2020
(2) Date of second expediting to be online: 5/06/2020
(3) Date of first expediting inspection : 5/19/2020
(4) Date of second expediting inspection (including audit): 5/26/2020
19
National periodic change project
03/19/2020
Issue 10903: announced on 3/19. Please go online and browse change areas before 3/30, and report the inquiry result by 4/21
More
Schedule of feedback audit
(1) Date of first expediting to be online: 3/30/2020
(2) Date of second expediting to be online: 4/08/2020
(3) Date of first expediting inspection : 4/21/2020
(4) Date of second expediting inspection (including audit): 5/04/2020
20
National periodic change project
02/18/2020
Issue 10902: announced on 2/18. Please go online and browse change areas before 2/27, and report the inquiry result by 3/19
More
Schedule of feedback audit
(1) Date of first expediting to be online: 2/27/2020
(2) Date of second expediting to be online: 3/06/2020
(3) Date of first expediting inspection : 3/19/2020
(4) Date of second expediting inspection (including audit): 3/26/2020
21
National periodic change project
01/22/2020
Issue 10901: announced on 1/22. Please go online and browse change areas before 2/7, and report the inquiry result by 2/26
More
Schedule of feedback audit
(1) Date of first expediting to be online: 2/7/2020
(2) Date of second expediting to be online: 2/14/2020
(3) Date of first expediting inspection : 2/26/2020
(4) Date of second expediting inspection (including audit): 3/5/2020
22
National periodic change project
12/02/2019
Issue 10806: announced on 11/29. Please go online and browse change areas before 12/10, and report the inquiry result by 12/30
More
Schedule of feedback audit
(1) Date of first expediting to be online: 12/10/2019
(2) Date of second expediting to be online: 12/17/2019
(3) Date of first expediting inspection : 12/30/2019
(4) Date of second expediting inspection (including audit): 01/07/2020
23
National periodic change project
10/30/2019
Issue 10805: announced on 10/18. Please go online and browse change areas before 10/29, and report the inquiry result by 11/18
More
Schedule of feedback audit
(1) Date of first expediting to be online: 10/29/2019
(2) Date of second expediting to be online: 10/05/2019
(3) Date of first expediting inspection : 11/18/2019
(4) Date of second expediting inspection (including audit): 11/29/2019
24
National periodic change project
08/19/2019
Issue 10804: announced on 8/19. Please go online and browse change areas before 8/28, and report the inquiry result by 9/18
More
Schedule of feedback audit
(1) Date of first expediting to be online: 8/28/2019
(2) Date of second expediting to be online: 9/04/2019
(3) Date of first expediting inspection : 9/18/2019
(4) Date of second expediting inspection (including audit): 9/25/2019
25
High frequency change project
05/23/2019
Issue 10813: announced on 5/23. Please go online and browse change areas before 6/3, and report the inquiry result by 6/24
More
Schedule of feedback audit
(1) Date of first expediting to be online: 6/03/2019
(2) Date of second expediting to be online: 6/11/2019
(3) Date of first expediting inspection : 6/24/2019
(4) Date of second expediting inspection : 7/07/2019
26
National periodic change project
04/19/2019
Issue 10802: announced on 4/19. Please go online and browse change areas before 4/30, and report the inquiry result by 5/20
More
Schedule of feedback audit
(1) Date of first expediting to be online: 4/30/2019
(2) Date of second expediting to be online: 5/07/2019
(3) Date of first expediting inspection : 5/20/2019
(4) Date of second expediting inspection (including audit): 5/31/2019
27
National periodic change project
03/22/2019
Issue 10801: announced on 3/20. Please go online and browse change areas before 3/29, and report the inquiry result by 4/22
More
Schedule of feedback audit
(1) Date of first expediting to be online: 3/29/2019
(2) Date of second expediting to be online: 4/09/2019
(3) Date of first expediting inspection : 4/22/2019
(4) Date of second expediting inspection (including audit): 4/29/2019
28
National periodic change project
11/28/2018
Issue 10706: announced on 11/28. Please go online and browse change areas before 12/07, and report the inquiry result by 12/26
More
Schedule of feedback audit
(1) Date of first expediting to be online: 12/07/2018
(2) Date of second expediting to be online: 12/14/2018
(3) Date of first expediting inspection : 12/26/2018
(4) Date of second expediting inspection (including audit): 01/04/2019
29
National periodic change project
10/17/2018
Issue 10705: announced on 10/17. Please go online and browse change areas before 10/26, and report the inquiry result by 11/15
More
Schedule of feedback audit
(1) Date of first expediting to be online: 10/26/2018
(2) Date of second expediting to be online: 11/02/2018
(3) Date of first expediting inspection : 11/15/2018
(4) Date of second expediting inspection (including audit): 11/22/2018
30
High frequency change project
10/01/2018
Issue 107109: announced on 10/1. Please go online and browse change areas before 10/11, and report the inquiry result by 10/31
More
Schedule of feedback audit
(1) Date of first expediting to be online: 10/11/2018
(2) Date of second expediting to be online: 10/18/2018
(3) Date of first expediting inspection : 10/31/2018
(4) Date of second expediting inspection : 11/07/2018
31
High frequency change project
09/10/2018
Issue 107203: announced on 9/10. Please go online and browse change areas before 9/19, and report the inquiry result by 10/11
More
Schedule of feedback audit
(1) Date of first expediting to be online: 9/19/2018
(2) Date of second expediting to be online: 9/27/2018
(3) Date of first expediting inspection : 10/11/2018
(4) Date of second expediting inspection : 10/18/2018
32
High frequency change project
08/27/2018
Issue 107108: announced on 8/27. Please go online and browse change areas before 9/5, and report the inquiry result by 9/26
More
Schedule of feedback audit
(1) Date of first expediting to be online: 9/5/2018
(2) Date of second expediting to be online: 9/12/2018
(3) Date of first expediting inspection : 9/26/2018
(4) Date of second expediting inspection (including audit): 10/03/2018
33
National periodic change project
06/15/2018
Issue 10703: announced on 6/15. Please go online and browse change areas before 6/27, and report the inquiry result by 7/17
More
Schedule of feedback audit
(1) Date of first expediting to be online: 6/27/2018
(2) Date of second expediting to be online: 7/04/2018
(3) Date of first expediting inspection : 7/17/2018
(4) Date of second expediting inspection (including audit): 7/30/2018
34
High frequency change project
05/21/2018
Issue 107103: announced on 5/21. Please go online and browse change areas before 5/30, and report the inquiry result by 6/20
More
Schedule of feedback audit
(1) Date of first expediting to be online: 5/30/2018
(2) Date of second expediting to be online: 6/06/2018
(3) Date of first expediting inspection : 6/20/2018
(4) Date of second expediting inspection : 6/27/2018
35
High frequency change project
05/07/2018
Issue 107201: announced on 5/7. Please go online and browse change areas before 5/16, and report the inquiry result by 6/5
More
Schedule of feedback audit
(1) Date of first expediting to be online: 5/16/2018
(2) Date of second expediting to be online: 5/23/2018
(3) Date of first expediting inspection : 6/05/2018
(4) Date of second expediting inspection : 6/12/2018
36
High frequency change project
04/23/2018
Issue 107102: announced on 4/23. Please go online and browse change areas before 5/3, and report the inquiry result by 5/23
More
Schedule of feedback audit
(1) Date of first expediting to be online: 5/3/2018
(2) Date of second expediting to be online: 5/10/2018
(3) Date of first expediting inspection : 5/23/2018
(4) Date of second expediting inspection : 5/30/2018
37
National periodic change project
04/20/2018
Issue 10702: announced on 4/20. Please go online and browse change areas before 5/02, and report the inquiry result by 5/22
More
Schedule of feedback audit
(1) Date of first expediting to be online: 5/02/2018
(2) Date of second expediting to be online: 5/09/2018
(3) Date of first expediting inspection : 5/22/2018
(4) Date of second expediting inspection (including audit): 5/29/2018
38
High frequency change project
03/26/2018
Issue 107101: announced on 3/26. Please go online and browse change areas before 4/3, and report the inquiry result by 4/26
More
Schedule of feedback audit
(1) Date of first expediting to be online: 4/3/2018
(2) Date of second expediting to be online: 4/13/2018
(3) Date of first expediting inspection : 4/26/2018
(4) Date of second expediting inspection : 5/4/2018
39
National periodic change project
03/16/2018
Issue 10701: announced on 3/16. Please go online and browse change areas before 3/27, and report the inquiry result by 4/18
More
Schedule of feedback audit
(1) Date of first expediting to be online: 3/27/2018
(2) Date of second expediting to be online: 4/02/2018
(3) Date of first expediting inspection : 4/18/2018
(4) Date of second expediting inspection (including audit): 4/25/2018
40
High frequency change project
12/11/2017
Issue 106112: announced on 12/11. Please go online and browse change areas before 12/20, and report the inquiry result by 2018/01/10
More
Schedule of feedback audit
(1) Date of first expediting to be online: 12/20/2017
(2) Date of second expediting to be online: 12/27/2017
(3) Date of first expediting inspection : 01/10/2018
(4) Date of second expediting inspection (including audit): 01/17/2018
41
National periodic change project
12/01/2017
Issue 10606: announced on 12/01. Please go online and browse change areas before 12/12, and report the inquiry result by 2018/01/02
More
Schedule of feedback audit
(1) Date of first expediting to be online: 12/12/2017
(2) Date of second expediting to be online: 12/19/2017
(3) Date of first expediting inspection : 01/02/2018
(4) Date of second expediting inspection (including audit): 01/09/2018
42
National periodic change project
10/20/2017
Issue 10605: announced on 10/20. Please go online and browse change areas before 10/31, and report the inquiry result by 11/20
More
Schedule of feedback audit
(1) Date of first expediting to be online: 10/31/2017
(2) Date of second expediting to be online: 11/07/2017
(3) Date of first expediting inspection : 11/20/2017
(4) Date of second expediting inspection (including audit): 12/03/2017
43
High frequency change project
10/02/2017
Issue 106109: announced on 10/02. Please go online and browse change areas before 10/16, and report the inquiry result by 11/03
More
Schedule of feedback audit
(1) Date of first expediting to be online: 10/16/2017
(2) Date of second expediting to be online: 10/23/2017
(3) Date of first expediting inspection : 11/03/2017
(4) Date of second expediting inspection : 11/16/2017
44
High frequency change project
09/11/2017
Issue 106203: announced on 9/11. Please go online and browse change areas before 9/20, and report the inquiry result by 10/12
More
Schedule of feedback audit
(1) Date of first expediting to be online: 9/20/2017
(2) Date of second expediting to be online: 9/27/2017
(3) Date of first expediting inspection : 10/12/2017
(4) Date of second expediting inspection : 10/19/2017
45
High frequency change project
08/29/2017
Issue 106108: announced on 8/28. Please go online and browse change areas before 9/6, and report the inquiry result by 9/26
More
Schedule of feedback audit
(1) Date of first expediting to be online: 9/6/2017
(2) Date of second expediting to be online: 9/13/2017
(3) Date of first expediting inspection : 9/26/2017
(4) Date of second expediting inspection : 10/2/2017
46
National periodic change project
08/18/2017
Issue 10604: announced on 8/18. Please go online and browse change areas before 8/29, and report the inquiry result by 9/18
More
Schedule of feedback audit
(1) Date of first expediting to be online: 8/29/2017
(2) Date of second expediting to be online: 9/5/2017
(3) Date of first expediting inspection : 9/18/2017
(4) Date of second expediting inspection (including audit): 9/25/2017
47
High frequency change project
07/10/2017
Issue 106202: announced on 7/10. Please go online and browse change areas before 7/19, and report the inquiry result by 8/8
More
Schedule of feedback audit
(1) Date of first expediting to be online: 7/19/2017
(2) Date of second expediting to be online: 7/26/2017
(3) Date of first expediting inspection : 8/8/2017
(4) Date of second expediting inspection: 8/21/2017
48
High frequency change project
06/26/2017
Issue 106105: announced on 6/26. Please go online and browse change areas before 7/5, and report the inquiry result by 7/25
More
Schedule of feedback audit
(1) Date of first expediting to be online: 7/5/2017
(2) Date of second expediting to be online: 7/12/2017
(3) Date of first expediting inspection : 7/25/2017
(4) Date of second expediting inspection: 8/1/2017
49
National periodic change project
06/20/2017
Issue 10603: announced on 6/20. Please go online and browse change areas before 6/29, and report the inquiry result by 7/19
More
Schedule of feedback audit
(1) Date of first expediting to be online: 6/29/2017
(2) Date of second expediting to be online: 7/6/2017
(3) Date of first expediting inspection : 7/19/2017
(4) Date of second expediting inspection (including audit): 7/26/2017
50
High frequency change project
06/14/2017
Issue 106104: announced on 6/12. Please go online and browse change areas before 6/21, and report the inquiry result by 7/11
More
Schedule of feedback audit
(1) Date of first expediting to be online: 6/21/2017
(2) Date of second expediting to be online: 6/28/2017
(3) Date of first expediting inspection : 7/11/2017
(4) Date of second expediting inspection: 7/18/2017
51
High frequency change project
05/22/2017
Issue 106103: announced on 5/22. Please go online and browse change areas before 6/2, and report the inquiry result by 6/21
More
Schedule of feedback audit
(1) Date of first expediting to be online: 6/2/2017
(2) Date of second expediting to be online: 6/8/2017
(3) Date of first expediting inspection : 6/21/2017
(4) Date of second expediting inspection: 6/28/2017
52
High frequency change project
05/11/2017
Issue 106201: announced on 5/8. Please go online and browse change areas before 5/17, and report the inquiry result by 6/7
More
Schedule of feedback audit
(1) Date of first expediting to be online: 5/17/2017
(2) Date of second expediting to be online: 5/24/2017
(3) Date of first expediting inspection : 6/07/2017
(4) Date of second expediting inspection: 6/14/2017
53
High frequency change project
04/24/2017
Issue 106102: announced on 4/24. Please go online and browse change areas before 5/3, and report the inquiry result by 5/23
More
Schedule of feedback audit
(1) Date of first expediting to be online: 5/3/2017
(2) Date of second expediting to be online: 5/10/2017
(3) Date of first expediting inspection : 5/23/2017
(4) Date of second expediting inspection: 6/1/2017
54
National periodic change project
04/20/2017
Issue 10602: announced on 4/20. Please go online and browse change areas before 5/1, and report the inquiry result by 5/19
More
Schedule of feedback audit
(1) Date of first expediting to be online: 5/1/2017
(2) Date of second expediting to be online: 5/8/2017
(3) Date of first expediting inspection : 5/19/2017
(4) Date of second expediting inspection (including audit): 5/26/2017
55
High frequency change project
03/29/2017
Issue 106101: announced on 3/27. Please go online and browse change areas before 4/7, and report the inquiry result by 4/27
More
Schedule of feedback audit
(1) Date of first expediting to be online: 4/7/2017
(2) Date of second expediting to be online: 4/14/2017
(3) Date of first expediting inspection : 4/27/2017
(4) Date of second expediting inspection : 5/4/2017
56
National periodic change project
03/22/2017
Issue 10601: announced on 3/20. Please go online and browse change areas before 3/29, and report the inquiry result by 4/20
More
Schedule of feedback audit
(1) Date of first expediting to be online: 3/29/2017
(2) Date of second expediting to be online: 4/7/2017
(3) Date of first expediting inspection : 4/20/2017
(4) Date of second expediting inspection (including audit): 4/27/2017
57
National periodic change project
11/28/2016
Issue 10506: announced on 11/28. Please go online and browse change areas before 12/07, and report the inquiry result by 12/27
More
Schedule of feedback audit
(1) Date of first expediting to be online: 12/07/2016
(2) Date of second expediting to be online: 12/14/2016
(3) Date of first expediting inspection : 12/27/2016
(4) Date of second expediting inspection (including audit): 01/04/2017
58
National periodic change project
11/24/2016
Issue 10501: announced on 3/16. Please go online and browse change areas before 3/25, and report the inquiry result by 4/18
More
Schedule of feedback audit
(1) Date of first expediting to be online: 3/25/2016
(2) Date of second expediting to be online: 4/1/2016
(3) Date of first expediting inspection : 4/18/2016
(4) Date of second expediting inspection (including audit): 4/25/2016
59
National periodic change project
11/24/2016
Issue 10502: announced on 4/15. Please go online and browse change areas before 4/26, and report the inquiry result by 5/16
More
Schedule of feedback audit
(1) Date of first expediting to be online: 4/26/2016
(2) Date of second expediting to be online: 5/3/2016
(3) Date of first expediting inspection : 5/16/2016
(4) Date of second expediting inspection (including audit): 5/23/2016
60
National periodic change project
11/24/2016
Issue 10503: announced on 6/15. Please go online and browse change areas before 6/24, and report the inquiry result by 7/14
More
Schedule of feedback audit
(1) Date of first expediting to be online: 6/24/2016
(2) Date of second expediting to be online: 7/1/2016
(3) Date of first expediting inspection : 7/14/2016
(4) Date of second expediting inspection (including audit): 7/21/2016
61
National periodic change project
11/24/2016
Issue 10504: announced on 8/17. Please go online and browse change areas before 8/26, and report the inquiry result by 9/14
More
Schedule of feedback audit
(1) Date of first expediting to be online: 8/26/2016
(2) Date of second expediting to be online: 9/2/2016
(3) Date of first expediting inspection : 9/14/2016
(4) Date of second expediting inspection (including audit): 9/23/2016
62
National periodic change project
11/24/2016
Issue 10505: announced on 10/17. Please go online and browse change areas before 10/26, and report the inquiry result by 11/15
More
Schedule of feedback audit
(1) Date of first expediting to be online: 10/26/2016
(2) Date of second expediting to be online: 11/2/2016
(3) Date of first expediting inspection : 11/15/2016
(4) Date of second expediting inspection (including audit): 11/22/2016